The gap after a speed change. Accelerate and it grows.
Max cartons per minute. Design to the worst case.
Center-to-center distance. Sanity-check the rate.
The formulas don't account for slippage. Never design right to the minimum. In solutioning, apply plus or minus ten percent and confirm the flow can carry the rate. Set the design target above average, deliberately, and write it down.