DRIVING QUESTION
Can every trade build their scope from this drawing without calling me?
The same system, read as callouts by trade. The gold ring marks the belt-speed callout, the one most often left off.
Who Needs Each Thing
Mechanical
- Layout, dimensions, clearances
- Sensor mounting angles
- Underside cover specs
Electrical
- Pull cord E-stop path
- Power and disconnects
- Safety gate interlocks
Controls
- Belt speeds and gaps
- PLC transfer delays
- Aux I/O locations
- Accumulation release modes
DESIGN PRINCIPLE
The drawing is the plan, not a starting point.