A change to one section never happens in isolation. The drawing connects everything. So before I approve anything, I think through the downstream effects, and then I capture what actually got built in the as-built. That as-built is a legal document. Five years from now, when the customer wants to expand, somebody designs from it. If it doesn't match reality, they're starting from a lie.
